Is there any way to tell the the Fibaro controller is actually receiving commands? Since mine is out in the yard and behind a tree it may be too far from the V2 hub, although it used to work with the V1 hub. Is there any way to check this?
As in, other than it actually doing what it’s supposed to be doing?
I wasn’t sure if this was in reply to my comment but if it was, the lights are not turning on/changing color, etc. They used to work with the V1 hub and now when I send commands nothing happens. I was able to re-pair the fibaro controller but can’t get anything to actually work when I send commands via the app.
Have you turned on the logs through the IDE? Also try doing a Z-Wave repair to see if the device is successfully in the mesh.
I don’t have V2 hub, but doesn’t it have a battery so you can move it closer to the device for pairing.
These are the errors I got:
3:04:29 PM: trace cp desc: Network repair for Fibaro RGBW Controller [08]: Failed to update mesh info
3:05:01 PM: trace cp desc: Network repair for Fibaro RGBW Controller [08]: Failed to update route
I see what you mean, I’m still not used to being able to have access to that level of detail (Wink hub) as mentioned by @beckwith , I hope you didn’t take my post as negative! I genuinely still trying to learn without the ST hub! 
I suggest rebooting your hub, let it settle down for about a half hour and rerun the Z-Wave repair again. My setup of about 200 devices sometimes takes several repairs before it gets fixed.
The radio signal on V2 may be a slight different than V1. They recommended V1 to be positioned horizontal. Maybe it is different with V2.
Kind of off topic, but I’m planning on getting this controller along with RGBW light strip(s) for my tray ceiling. It’s about 70 feet I’d need however. Does anyone have any suggestions on how to handle such a long run?
I’m not promoting this at all since I’m VERY cautious about these cheap devices however, what you are looking for a is an RGB ‘amplifier’/extender like this:
Each time you use one of these you need another power supply of the same voltage you used at the start, also there is some question about the ability to dim correctly when you use them. Note that I’ve never used one myself but I plan to at some point.
Any idea what the maximum length I can do before needing to add an amplifier? Is it just the 16.4 feet that most of the strip lights are?
I would have to go back and measure, but I have about 24’ wired together and they work fine. There is no dimming at the end of the strips. I also have two 24" strips wired through the same controller for LED waterfalls and everything seems plenty bright.
I went and looked at the floor plans, looks like I’ll need to cover 76 feet.
With the Fibaro controller can I start two lines (one going in each direction), run 24 feet, then add an amplifier to the end of each one and add the remaining 14 feet to each end? Seems like it would be the most cost effective and least complicated way of doing it.
A lot seem to quote 16.4ft/5 meters for 12V and double that for 24V but then it entirely depends on the device initiating (in this case the Fibaro RGBW Controller) and the power supply you are using with it.
According to this manual on the Fibaro website:
“Rated output power: combined 12A (sum of all connected output channels); 6A for single output channel”
Is that one continuous string with no ‘amplifiers’?
I am not using any amplifiers other than the original power supply. The two 24" strips run through a heavier gauge and more wire before they reach their output. The 24’ strip is on the regular small gauge wire and runs about 15 feet before the actual strips. Then again I can’t get my lights to work since switching to the V2 hub, so maybe I fried the fibaro board, but I doubt that is the issue. This is the power supply that I used: http://www.amazon.com/gp/product/B00K7MVVDQ?psc=1&redirect=true&ref_=oh_aui_detailpage_o05_s00
Is there any disadvantage to using 24V instead of 12V? It seems like you can do longer runs and use less wattage?
it looks like that all lines up nicely from what I read. I am using the laptop-type power supply and that output is 12V 5A. Both the strips I have and the new ones I’m getting are about 4.75A / roll. A roll is 5M or 16.5ft. Your power supply is 12V & 11A which is enough to drive 2 strips.
The fibaro doc had a limit on the Amps. I seem to remember that going up in Volts cuts the Amps, so a 24V setup could handle more lines.
Someone keep me honest on that!
I’m using a similar PSU for my Dresden (similar concept but ZigBee and is supported on the Hue Bridge) but that has half the amount of current capacity (6A), looks like you are just under the capabilities of the Fibaro which can handle 12A, another reason to go with the Fibaro in my mine!
And if I understand you right, you’re connecting multiple strips directly to the controller to get around the current/wire gauge issues? One long strip at 12A’s is probably going to melt the wires, right?
But you say that the dimming doesn’t work at the end of the strip? Could you explain a little more please?
Yes it lists it at 12A total but doesn’t specify at what voltage so if my electronics doesn’t fail me (someone will need to verify for me as well!!!) in theory with 12A@24V you could use longer strips/more lines?
There is not issue with the wire gauging, I just went with what came out of the box for my led strips and waterfall leds (the two 24" strips). The only reason the two 24" strips have thicker wires is that they are designed for a longer wire run and used in a water/underground scenario. In a way it probably helped keep the voltage equal between that and the standard led strips I am using. At the fibaro I just twisted the wires together and hooked them in to the (tiny) slots in the controller.
As for the dimming, I wasn’t referring to dimming functionality but rather a voltage drop at the ends of the led runs. I have heard that can occur with long runs of LED strips. However, the lights seems to maintain brightness throughout the entire run. I guess I should have referred to it as brightness. 